This project was my first one abroad from 2008 to 2012. The project includes three oil trains and three gas trains, including early production. Practically I followed the construction phase, commissioning, start-up, and maintenance routine. Challenging project due to weather conditions, in summer, reached and sometimes exceeded 55 ° C of temperature. A project in the start-up phase was quite dangerous for the concentration of H2S and high pressures (540 bar). To read more click on figure above.
Mellitah Oil & Gas BV (Mellitah Oil) is an oil and gas company that offers exploration services. It explores and develops crude oil and natural gas products.
Kashagan is one of the largest and most expensive offshore projects in the world. This project including onshore made oil & gas history.
Everything that can done in the oil and gas industry has been tested in this project. Let's see the main parts of the plant. This project consists of several islands located in the Caspian Sea, each one of these offshore complexes or artificial islands has been designed and built to deal with the unique challenges associated with producing Oil and Gas from this region of the Caspian Sea.
Garibaldi C plant is a fixed platform for the production of natural gas, always monitored. It consists of a tubular steel structure supported by 8 legs fixed into the seabed and connected by a bridge, approximately 60 m long, to the other platform Garibaldi K.
Explain to you how all this mistaken idea of denouncing pleasure and praising pain sed was born and I will give you a complete account of the system, and expound
We offer the best and economical solutions, backed by 27+ years of experience and international standards knowledge, echnological changes, and industrial systems.